top of page
Search

Air Handlers

  • Writer: Peter Armstrong
    Peter Armstrong
  • Sep 28, 2020
  • 1 min read

To supplement the radiant heat system -- and to provide quicker response and fine tuned zoning -- a forced hot air system has been added, requiring five air handlers to be hidden throughout. From top left, clockwise: under the roof behind an attic bathroom, in the mechanical room, in the garage, in the attic above the MBR bathroom, and in the attic under the central gable.

 
 
 

댓글


  • Facebook
  • Twitter
  • LinkedIn

©2019 by Owenoke Project. Proudly created with Wix.com

bottom of page