top of page
Search

Site Work

  • Writer: Peter Armstrong
    Peter Armstrong
  • Sep 28, 2020
  • 1 min read


ree

The excavators are back, just ahead of the concrete crew, to start prepping for the hardscape site work. Here, a trench has been excavated where footings and a concrete stem wall will be poured to form the basis of the retaining wall that will transition the grade from the living room terrace to the pool surround.


 
 
 

Comments


  • Facebook
  • Twitter
  • LinkedIn

©2019 by Owenoke Project. Proudly created with Wix.com

bottom of page