Trimmed
The exterior casings have been installed on the second and third floor wood windows while the mechanical rough-in work continues inside.
Peter Armstrong
Jul 19, 2020
Â
Â
Â


Guardrail Mockup
This is the winning wooden mock-up of the rooftop deck guardrail, made to test alternative railing designs and proportions. The...
Peter Armstrong
Jul 3, 2020
Â
Â
Â


Wrapped
The house has been wrapped with Henry Blueskin VP100, a self-adhesive peel-n-stick vapor permeable air and water barrier. The wrap is a...
Peter Armstrong
Jul 3, 2020
Â
Â
Â


Rough-In Race
The rough-in mechanical inspection is scheduled for July 17 so the race is on to get HVAC, electric, plumbing, alarm, and audio/visual...
Peter Armstrong
Jun 29, 2020
Â
Â
Â


Snow Guards
Snow guards, to prevent avalanching, have been installed on all the leading edges of the copper roofs just behind the integrated gutters....
Peter Armstrong
Jun 28, 2020
Â
Â
Â


Repairing the Seawall
Nor'easters and superstorms over the years have wreaked havoc on the seawall (built in 1936) and now, with increasing frequency, stones...
Peter Armstrong
Jun 27, 2020
Â
Â
Â


Windows In, Roof On
Click for some progress views.
Peter Armstrong
Jun 7, 2020
Â
Â
Â


Tapping the Water Main
The utility sent a large crew, probably eight men, to tap the water main on the street and run a line to connect the house. It was an...
Peter Armstrong
Jun 4, 2020
Â
Â
Â


Windows
The Dynamic double-hung wood windows (shown here in the upstairs TV room), with retractable insect screens (shown below), were delivered...
Peter Armstrong
Jun 3, 2020
Â
Â
Â


Lightning Protection
Look carefully and you will see three of the nine lighting rods installed on the ridge, part of the lightning protection system that also...
Peter Armstrong
May 16, 2020
Â
Â
Â


Garage Slab
The 4" concrete slab is ready to be poured in the garage. Here you see the rebar grid and the radiant heat tubing set on top of rigid...
Peter Armstrong
May 15, 2020
Â
Â
Â


Flat Roof
For durability and to minimize the risk of leaks over the long-term, a Kemper resin-based liquid roofing system is being used in all the...
Peter Armstrong
May 14, 2020
Â
Â
Â


Chimney Rising
The masons continue to make progress on the two chimney masses, with the living room / terrace mass reaching past the second floor this...
Peter Armstrong
May 13, 2020
Â
Â
Â


Freedom Gray
The installation of the standing seam metal roof is in progress. The tin-zinc alloy coated copper, called Freedom Gray, is by the Revere...
Peter Armstrong
May 13, 2020
Â
Â
Â


Rough-In Begins
While the roofers work to get the building watertight, some of the mechanical contractors have been able to get a head start on their...
Peter Armstrong
May 3, 2020
Â
Â
Â


Exterior Trim
Exterior trim work began this past week. Here you can see a rake board running up the gable and the rafter tails with cut-outs for the...
Peter Armstrong
Apr 18, 2020
Â
Â
Â


Fire Boxes
Four fireplace masses are just about ready for damper and smoke chamber inspections, scheduled for Tuesday. Starting at the top left and...
Peter Armstrong
Apr 17, 2020
Â
Â
Â


Framed
The rafters that make up the west (and final) gable roof have all been installed. The framing team will now complete the roof sheathing,...
Peter Armstrong
Apr 13, 2020
Â
Â
Â


Progress
Click for another.
Peter Armstrong
Apr 3, 2020
Â
Â
Â


Chimney Mock-Ups
Two granites, two coursing patterns, and two joint widths. Decisions, decisions.
Peter Armstrong
Apr 1, 2020
Â
Â
Â
Home: Blog2
Home: Subscribe
bottom of page